TOWN MANAGER

Thomaston Maine Town Manager

VAL BLASTOW
This email address is being protected from spambots. You need JavaScript enabled to view it.

MDOT will be test boring the Wadsworth Street Bridge crossing the St. George River the week of November 1, 2010.  Therefore, the bridge width will be reduced to nine feet, one lane.

Copyright © 2015. All Rights Reserved.